How long does a website redesign take?

For a standard business website, we aim for about three weeks from start to launch. That is a target rather than a guarantee, and the biggest variable is how quickly feedback and content come back from your side.

BY SPRAY MEDIA · UPDATED 29 SEPTEMBER 2026

The three-week aim, and what moves it

We plan a standard business website redesign around three weeks from start to launch. That is what we aim for, and it is realistic when decisions are made as the project moves.

It can be shorter. It can also be longer. The variable is almost never design or build time, which we control, but how quickly wording, approvals and photography arrive from your side, which we do not. A project that waits a fortnight for photos takes a fortnight longer, and no amount of build speed makes that up.

A larger job needs its own schedule. A migration with years of published pages to map, a booking system, or a member area all take more work than a focused service website. We confirm the timeline in your proposal rather than quoting one figure for every project.

The phases of a redesign

Every project moves through the same broad stages. Knowing them makes it much easier to see where a delay has come from, and who needs to act.

  • Understand. We review your current website, your search data where available, and what you want the site to do.
  • Agree the scope. We settle the page list, the functionality and who is providing each piece of content.
  • Content and structure. We shape the wording and plan how the pages fit together.
  • Design. The key pages are designed and sent to you for review before the build begins.
  • Build and check. The site is built, then tested, including the enquiry forms and the mobile experience.
  • Migration and launch. Domain, hosting, redirects, tracking and Search Console are connected and checked.

What speeds a project up

Projects move quickly when the inputs are ready. In practice that means:

  • Service descriptions and customer questions supplied early, even as rough notes.
  • Photography and brand assets shared in good quality, not pulled from a social post.
  • One decision maker on the business side rather than several people with different opinions.
  • Feedback returned as one consolidated round instead of a trickle of changes.

What slows a project down

None of the following is unusual, and all of it is easier to manage when it is identified in the proposal rather than discovered halfway through:

  • Waiting on content, photos or internal approvals.
  • Scope that grows after the page list has been agreed.
  • Features that appear late, such as booking tools, product data or member areas.
  • A migration with a large number of existing addresses to map.
  • Access delays on the domain, hosting, email or Analytics accounts.

How to keep your redesign on schedule

Agree the scope and the page list in writing, and keep the review stages tight. If something new is needed partway through, price it and make a decision rather than folding it quietly into the existing work.

Ask at the start which decisions belong to you and which belong to your designer, so nothing sits waiting without anyone noticing that it is waiting.

What happens after launch

Launch is the beginning of the measurement period, not the end of the project. Search engines need time to process the change, and enquiries need to be watched for a few weeks before you can judge whether the new path is working.

The redesign package includes 60 days of SEO and updates after launch to cover that settling period.

Common questions

So how long does a small business website redesign actually take?

We aim for about three weeks from start to launch on a standard business website. It is a target, not a guarantee. It can come in under that, and it can run over if feedback, wording or photography are slow to come back from your side.

Can a redesign be done faster?

Often, yes, if the content is ready and the scope is tight. Tell Mark your deadline at the start and you will get an honest answer about whether it is realistic, rather than an agreement that quietly slips.

What delays a website redesign the most?

Waiting on content and photography. Design and build time are the parts we control and they are usually predictable. The variable is how quickly decisions, wording and assets arrive from the business side.

Do I need to be available during the build?

Not day to day, but you do need to be available at the review stages. Projects stall when feedback is delayed, so it helps to know in advance who is reviewing and when.

When should I start if I need the site live for a busy season?

Work backwards from the season rather than forwards from today, and allow more than the three-week aim for the content stage. Search engines also need time to re-index a new site, so a launch the week before your busiest month is usually too late.

Related reading: what a redesign costs, the redesign checklist, all redesign guides or recent projects.

YOUR NEXT CHAPTER STARTS HERE

Ready for a website that pulls its weight?

A complete business website redesign for $2,200 inc GST, with no fixed page cap. Talk directly with Mark. Ecommerce quoted separately.

Talk about your website